1. Choose a reasonable means of transportation
The means of transport generally refer to conveyor belts or other glass loading equipment. Calculate the speed and length of the conveyor belt or other glass loading equipment according to the product interval length and the actual situation. LIJIANG Glass could realize the functions of automatic transfer, storage, and sheet sorting, and the entire processing production line does not need manual handling of glass production.
2. Production line layout
The graphic design of the production line should ensure that the transportation route of the parts is the shortest, the production workers are easy to operate, the auxiliary service department is convenient to work, the production area is used most effectively, and the interconnection between the production lines is considered. The position of the production line involves the relationship between the various production lines. It should be arranged according to the order required for the assembly of the processing components. The overall layout should consider the flow of materials, thereby shortening the route and reducing the workload of transportation.
3. Develop a production line standard plan
According to the glass deep processing plan from LIJIANG Glass, each work station is repeatedly produced according to a certain rhythm, and the standard plan instruction chart of the production line can be customized to show the production line production schedule standard, work system, and work procedure, etc. Provide a basis for the preparation of production operation plans.
4. Determine the production line beat
The beat of the production line is the time interval between the sequential production of two identical products, which can indicate the productivity of the production line and is the most important working parameter of the production line.
When the size of the glass processed on the production line is small and the cycle time is only a few seconds or tens of seconds, the parts will be transported in batches. At this time, the time interval between the production of two batches of the same product is called the rhythm, which is equal to the cycle time and transportation. The product of batches. When the production line adopts batch transportation of products, if the batch is large, although the transportation work can be simplified, the product occupancy of the production line will increase accordingly.